K.Hill manganese project, Botswana

14th August 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project

K.Hill manganese project.

Location

Kanye basin, Botswana.

Project Owner/s

Battery metal development company Giyani Metals Corp (100%).

Project Description

The project proposes mine-to-market development, which will produce high-purity manganese sulphate monohydrate (HPMSM) and high-purity manganese oxide (HPMO) for the electric-vehicle and energy-storage sectors. The project is based on a conventional openpit mining operation and a hydrometallurgical processing facility designed to process about 220 000 t/y of dry run-of-mine ore over a 25-year mine life. The May 2026 definitive feasibility study (DFS) is based on proven and probable mineral reserves of 5.35-million tonnes grading 12.0% manganese and 15.5% manganese oxide. Life-of-project production is estimated at 1.50-million tonnes of HPMSM and 99 000 t of HPMO, with metallurgical recovery averaging 87%.

Potential Job Creation

Not stated.

Net Present Value/Internal Rate of Return

The DFS estimates an after-tax net present value (NPV), at an 8% real discount rate, of $481.5-million and an internal rate of return (IRR) of 20.3%. The pretax NPV is estimated at $531-million and the IRR at 21.1%. After-tax payback from the start of processing is estimated at 4.8 years.

Capital Expenditure

Initial capital expenditure is estimated at $535-million, including contingency.

Planned Start/End Date

Construction is scheduled to start in April 2027 and continue for about 20 months. Cold commissioning is planned for November 2028, followed by hot commissioning in early 2029. First ore feed is targeted for March 2029.

Latest Developments

Giyani plans to undertake further optimisation work, including improvements to manganese recovery, front-end engineering and design work, plant-layout optimisation, increased solar-power utilisation, lower-carbon reagent sourcing and expanded international procurement activities.

Giyani will continue discussions with strategic partners and evaluate opportunities in the battery-grade manganese sector as it advances the project towards development.

Key Contracts, Suppliers and Consultants

ERM Global (mineral resource estimate); Ukwazi (mineral reserve estimate, mining method, mining capital cost and mining operating cost); Knight Piésold (mining geotechnical, hydrogeology, hydrology, civil geotechnical, tailings storage facility and waste-rock dump design); Wood (metallurgy, process design, infrastructure, capital cost and process plant operating cost); Coastal & Environmental Services (environmental studies, permitting and social work); and SC Insights and Fastmarkets (market intelligence and pricing support)

Contact Details for Project Information

Giyani Metals, tel +1 289 291 7632 or

email info@giyanimetals.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

Magazine round up | 14 August 2026
Magazine round up | 14 August 2026
14th August 2026

Showroom

M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

TSAM commemorates production of new Hilux
TSAM commemorates production of new Hilux
12th August 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.061 0.144s - 170pq - 2rq
Subscribe Now